TM50 -Parapet Type Double Track Pipe Rail - BMU System
TM50 -Parapet Type Double Track Pipe Rail - BMU System
A facade cleaning system moving on dual pipe rails connected to steel brackets mounted inside the parapet. Designed for narrow terrace areas. With boom length 2.5-6m, ±175° body rotation and ±45° pergel rotation, suitable for buildings up to 300m. Manufactured and installed in compliance with EN1808 standards.
Product Features
Inside Parapet Mount
System connected with steel brackets mounted inside the parapet.
Narrow Area Design
Specially designed for use in narrow terrace areas.
Dual Pipe Rail
Horizontal movement system on dual pipe rail.
Hydraulic System
Adjustable facade distance, platform can park at terrace level.
±175° Rotation
Main body rotates ±175° for access to every point on the facade.
300m Capacity
Can be used in buildings up to 300 meters.
Product Gallery
Technical Specifications
| TECHNICAL SPECS | TM-50 |
|---|---|
| System Type | Inside Parapet |
| Boom Length | 2,5 - 6 mt |
| Body Rotation | ±175° |
| Pergel Rotation | ±45° |
| Horizontal Movement | Dual Pipe Rail |
| Max Building Height | 300 mt |
| Platform Options | Motorized / Non-motorized / Folding |
| Standard | EN1808 |
System Components
TM-50 Parapet Mount Facade Cleaning System moves on dual pipe rails connected to steel brackets mounted inside the parapet. Designed for buildings with reinforced parapets in narrow terrace areas.

Get information about our TM-50 Parapet Mount Facade Cleaning System.
Contact us for a parapet mount facade cleaning system suitable for your building structure.